Overhaul of the roof using roller coatings, where bitumen mastic is used, is carried out once every seven years, only if the annual current repairs are carried out efficiently.
Today, during construction and repair work, work is usually carried out to warm the house. Since, usually insulation work is carried out not in the cold season, it is not easy to assess the quality of the work carried out. Fortunately, today there is such a device as a thermal imager, examination of houses with a thermal imager allows you to identify the lack of thermal insulation of the house. By clicking on the given link, you can order the warhead of the house with a thermal imager at favorable prices with professionals.
Rolled materials, this refers to roofing material, only and permamine. They are made of two layers of the roof: the lower and upper ones, and for this reason it is necessary to follow all the recommendations for the use of these materials. Non -compliance with recommendations can lead to a small service life. It is also necessary to know that the area of the patch should be more than 10 centimeters than the site that is repaired.
Roofing material and only on both sides are covered with different powders, so as not to glue during storage or transportation. This powder must be removed while using this material. In order to make it easier to remove it, you need to lubricate it with oil, for example, green. After the surface has been lubricated, the powder is easily removed with a steel brush.
For the start of repair work, it is necessary to carefully clean the garbage and dry the place to be repaired. After that, you can start gluing patches, which were previously warmed up by mastic. In order for the mastic not to crack, and does not spread from the effects of sunlight, it is necessary to sprinkle excess mastic with warm sand. The patch must be crushed with something heavy, which is removed after drying. So that the load does not stick, the sand must be sprinkled more.
Leave a Reply