The concept of plaster comes from the Italian word. This is a layer of material that is applied to the surface of the walls both outside and inside the building with the aim of aligning and protecting them from moisture.
Apply a plaster solution on an early prepared surface (cleansed of dust, dirt, paint). Perform finishing work after the shrinkage of the building (approximately 1-1.5 years after its construction). Preparation of walls.
If the walls are smooth, then it is necessary to make notes or fix a metal mesh, in its absence, dowels are clogged and wire is pulled. Before applying the solution, it is recommended to treat the walls with a soil mixture (acrylic, antifungal, antibacterial) or moisten casino with water.
To align the walls and convenience of the sketch of the material on the walls, lighthouses of various sizes are installed. The plaster of the premises is made by blocking three layers-spraying, primers and covers, but the total thickness should not be more than 20-25 mm.
All layers are applied in strict alternity, after the previous. Plasting the surface of the ceilings, walls, as well as all kinds of partitions manually or a cell and a board with plaster (falcon).
The alignment of the plaster is carried out by a half -plane made of wood. The covering is applied with a spatula from the falcon after aligning the primer, which in turn has hardly hardened, but did not dry out.
The covering layer with ironing or graters is removed before the solution has not yet been completely hardened by smoothing and compaction.